Brand new marine construction, new power tower and new water lines. The decking is Azek which is a solid composite pvc. Built by one of the best companies in the county. The slip is on the outside T dock, the length is 45 feet long, 16 foot beam and 8 feet of depth. This slip is in a high end gated community. This slip is the closest to the parking lot, which makes it one of the best in the marina.